MSW facility: Revamping of the organic fraction
area. Demolition, adaptation and new
installation of processes and equipment
Improvements:
Treatment Capacity
Inerts accumulation in digester/tanks solved
High capacity for pulping and inerts separation
Low efficiency of the process solved
Process design improvements
Scope:
Detailed construction project
Process, equipment, electrical and control design
P&ID and piping development
Control system development
Procurement