Project: Arganda D&Construction Waste recycling plant

Year:

2013

Plant Capacity: 400.000 tons/year

Current status: In Operation

Location: Arganda (Spain)

Project Description: D&C recycling plant
Landfil

Techical details: Mixed D&C waste recycling line
Concrete recycling line
Baler for recyclates
Landfilling for plant refuse

Scope: Civil design
P&ID
Process design
Detailed equipment design
Electrical and control design